|
» Forum » Fahrzeuge » Fahrzeugtechnik » Geomembrane Maintenance Method
Geomembrane Maintenance Method |
Alisajune Thomas Gast Posts: 38 |
Before we introduced five points on how to maintain the wholesale smooth hdpe geomembrane. Today we will come to understand three more points.
1. The worn geomembrane must be repaired by laying and thermally joining the small pieces. The thermal connection must be strictly controlled to ensure that the patch and the geomembrane are tightly bonded and not damaged.
2. Before the end of the laying of the geomembrane, visually inspect the surface of all the paving materials on the day to ensure that all damaged areas have been marked and repaired immediately to determine that there are no foreign substances on the paving surface that may cause damage.
3. At the bottom of the landfill, if the crack exceeds 10% of the width of the coil, the damaged part shall be cut off and then the two geomembranes shall be connected. If the crack exceeds 10% of the width of the coil on the slope, it shall be The role of geomembrane was removed and replaced with a new roll of bentonite waterproof blanket.
|
|
|
[ Script Copyright by ilch.de ]
|
|
Statistik |
Gesamt: 421397 Heute: 662 Gestern: 697 Online: ... mehr
|
|